COALING ARRANGEMENT

MAIN DECK

Sixteen booms (eight per side) lifted the coal aboard, with each boom operated by a gypsy head that was connected to either the starboard or port  steam engine on 2nd deck. Once the coal was aboard, twenty-eight 24 inch coal chutes passed the coal to the four storage levels below.