25 February to 21 May 1944 and 25 July to 14 September 1944 |
|
1st Start 25 February 1944 Removed is the SC-1 radar antenna atop the foremast and the SG antenna from below the fire control tower to the SC-1 location. Changes made Boston Navy Yard, 23 January and 25 February 1944. 1st End: 22 May - 7 July, catapult not aboard. 7 July to 25 July catapult back aboard but lashed to the main deck. 2nd Start: 25 July catapult reinstalled atop turret 3. 2nd End: 14 September the last day underway in Measure 22 paint scheme. click on image for full size |